How to prepare for your first farm audit (a 90-day plan)

FieldSafe team · Draft, scheduled

FieldSafe Today's audits card: the few farm tasks that move the most audits forward, with the planned audit date
Today's audits card: the few farm tasks that move the most audits forward, with the planned audit date.

Start about 90 days before the audit. Use the first month to choose the standard and book the certification body, the second to gather the records you already have, and the third to assess yourself honestly and fix the gaps. The week before is for checking, not for building a binder from scratch.

This plan is written for a small or medium grower with no full-time technical manager: the owner or farm manager doing audits on top of everything else. It works for GLOBALG.A.P. IFA v6, GRASP and SIZA. The details differ by standard, so check the current official document for yours.

90 days out: choose the standard and the certification body

Find out what your market needs

Your buyer decides, not you. Ask your exporter, packhouse or buyer in writing:

  • Which standard: GLOBALG.A.P. IFA v6 (and which edition, Smart or GFS), SIZA Social, SIZA Environmental, GRASP, or a combination?
  • By when must it be in place?
  • Which certification bodies or audit firms do they accept?

If GLOBALG.A.P. is on the list, read IFA v6 Smart vs GFS. If SIZA is, read SIZA Social vs SIZA Environmental. For worker welfare, read GRASP explained.

Choose a certification body or audit firm

For GLOBALG.A.P., you register with an approved certification body and receive a GGN, the GLOBALG.A.P. Number that identifies you in their database. For SIZA, you register on MySIZA and complete the self-assessment there before an approved audit firm is arranged. Check the current steps on globalgap.org and siza.co.za.

Ask two or three certification bodies for a quote and a date. Costs vary with farm size, crops and add-ons, so we will not guess a figure here; get it in writing.

Book the date and plan backwards

Pick a date when the farm is working normally. Auditors want to see real work, and for social audits they need to speak to workers who are actually there. Put the date in your diary and count back 90 days.

Download the official checklist

Get the current checklist and general rules from the standard owner. Read the level of each item (for GLOBALG.A.P., major must, minor must or recommendation). Do not try to memorise it; you will work through it in a structured way later.

60 days: gather what you already have

Most farms have more evidence than they think. It is just scattered: spray records in a book at the store, training sign-in sheets in a drawer, water readings on a WhatsApp group, the borehole permit in a file at home.

Spend this month bringing it together. A useful order:

  1. Spray records for the last season, and the operators’ training.
  2. Fertiliser records and the advice or analyses they were based on.
  3. Water: sources, permits, meter readings, any water tests.
  4. People: staff list, contracts, training registers, PPE issue, first-aid certificates.
  5. Harvest and traceability: harvest, packing and dispatch records.
  6. Documents: risk assessments, policies, maps, the emergency plan.
  7. Waste: where empty containers and oil went, with slips.

A practical example

Lerato and her father farm 35 hectares of avocado near Haenertsburg. Their packhouse wants GLOBALG.A.P. IFA v6 and SIZA Social next season. Neither of them has done an audit before.

They switch audits on in FieldSafe. Under Your farm for audits, most farm facts are already answered by their records: they spray, they irrigate from a dam and a borehole, they employ seasonal workers. A few short questions cover the rest. Items that clearly do not apply show as “Not needed here because…”, and they can change any of them.

Old paper records go in as “a record to keep”: a scan or photos combined into one PDF, with the kind of record described. FieldSafe keeps the file exactly as given and does not read it automatically, so Lerato confirms the key details next to the original.

From now on, new records are captured on the phone as the work happens. After a spray is saved, FieldSafe shows “Counts for…” with each audit it helped.

30 days: self-assessment and fixes

This is the most important month. Go through the checklist item by item and ask one question: can I show the evidence for this today?

For GLOBALG.A.P., a self-assessment before the inspection is expected; for SIZA, the self-assessment questionnaire on MySIZA comes first. Check the current rules for who must do it and how often.

Sort what you find into three lists:

  • Have it. The evidence exists and is current.
  • Missing. Nothing exists yet.
  • Needs a look. Something exists but is out of date, incomplete or in the wrong name.

In FieldSafe, the One audit view does this sorting for you. Each control point is a row and the header shows counts: with evidence, missing, need a look, not needed here. FieldSafe gives counts, never a score or percentage, because a percentage hides exactly the items an auditor will ask about.

Fix in this order:

  1. The serious gaps first. For GLOBALG.A.P., that means missing major musts.
  2. Things that take time. Training courses, water tests and lab analyses need booking, sometimes weeks ahead.
  3. Documents. Risk assessments and policies. FieldSafe has 36 policy and risk-assessment templates, prefilled from farm data where it can, and keeps them as controlled documents with a number, revision and approver.
  4. Everything else.

Today and the Calendar in FieldSafe show the few things that move the most audits forward, with “Plan this” to turn a gap into a job for someone this week.

The week before

The week before is for checking, not creating.

  • Walk the farm as an auditor would: chemical store, fuel, workshop, toilets and handwashing, first-aid kits, signage, water points, waste area.
  • Test traceability. Pick a dispatch and trace it back to the Blocks and the sprays before picking. Then go forward from a Block to who received the fruit.
  • Brief the team. Tell supervisors and workers that an auditor is coming, that they may be asked questions, and that the honest answer is always the right one. Never coach workers on what to say.
  • Prepare the room. A table, power, copies of the documents the auditor will ask for first, and someone who knows where everything is.

In FieldSafe, issue the audit pack: PDFs plus an evidence ZIP. Once issued, the pack is frozen exactly as it was, even if you correct working records later, and any gaps are listed honestly.

FieldSafe audit folder with packs that are frozen when issued
The audit folder, with packs that are frozen when issued.

On the day

  • Start on time with the opening meeting. The auditor explains the plan for the day.
  • Answer what is asked. If you do not know, say so and find out. Do not guess.
  • Show, don’t tell. Open the record, walk to the store, show the meter.
  • Let workers speak freely. Social audits rely on private interviews.
  • Take notes in the closing meeting. Make sure you understand each finding and the deadline to fix it.

After: corrective actions

Most first audits find something. That is normal. What matters is how you respond.

  • Fix the cause, not only the paper. If an operator’s training had lapsed, book the training and record it, then set the next date.
  • Send proof by the deadline your certification body or SIZA sets.
  • Keep the proof with the item, so next year starts from a better place.

In FieldSafe, you can report a problem on an audit item as corrective work. An audit with an open problem never reads as ready. After the audit, the system keeps doing its job: records captured every day mean next year’s preparation is mostly about the few gaps that are left.

Start your readiness check

See how FieldSafe lays out all four audits, or download the free SIZA readiness checklist. FieldSafe is in early access: join early access and start your readiness check with the records you already have.

FieldSafe helps you prepare; certification is decided by your certification body.

Early access

Be one of the first farms on FieldSafe.

FieldSafe is in early access. Join, and we help you set up your farm and try it on your team's own phones.